-
Topics
Subnavigation
Topics
Electromagnetic fields
- What are electromagnetic fields?
- High-frequency fields
- Radiation protection in mobile communication
- Static and low-frequency fields
- Radiation protection relating to the expansion of the national grid
- Radiation protection in electromobility
- The Competence Centre for Electromagnetic Fields
Optical radiation
- What is optical radiation?
- UV radiation
- Visible light
- Infrared radiation
- Application in medicine and wellness
- Application in daily life and technology
Ionising radiation
- What is ionising radiation?
- Radioactivity in the environment
- Applications in medicine
- Applications in daily life and in technology
- Radioactive radiation sources in Germany
- Register high-level radioactive radiation sources
- Type approval procedure
- Items claiming to provide beneficial effects of radiation
- Cabin luggage security checks
- Radioactive materials in watches
- Ionisation smoke detectors (ISM)
- Radiation effects
- What are the effects of radiation?
- Effects of selected radioactive materials
- Consequences of a radiation accident
- Cancer and leukaemia
- Hereditary radiation damage
- Individual radiosensitivity
- Epidemiology of radiation-induced diseases
- Ionising radiation: positive effects?
- Radiation protection
- Nuclear accident management
- Service offers
-
The BfS
Subnavigation
The BfS
- Working at the BfS
- About us
- Science and research
- Laws and regulations
- Radiation Protection Act
- Ordinance on Protection against the Harmful Effects of Ionising Radiation
- Ordinance on Protection against the Harmful Effects of Non-ionising Radiation in Human Applications (NiSV)
- Frequently applied legal provisions
- Dose coefficients to calculate radiation exposure
- Links
Ceremony for the new BfS building: Modern infrastructure strengthens emergency response
In Berlin-Karlshorst, the office is to move into a building with a new crisis situation centre in 2025
The old building is a towering prefabricated building next to which a flat Y-shaped construction with many curves is being built. Next year, the Federal Office for Radiation Protection (BfS) will gradually move into the new building in Berlin-Karlshorst with offices, research facilities, and a modern situation centre for radiological emergency protection. On Monday, 23 September 2024, many of those involved in the project were invited by the Federal Office for Building and Regional Planning (BBR) to celebrate the halfway point of the expansion.
Dr Inge Paulini at the construction ceremony
At the construction ceremony, BfS President Inge Paulini pointed out that the new building is a great asset in many respects. "The changing international security situation and the war in Ukraine make it clear that the Federal Office for Radiation Protection needs a state-of-the-art infrastructure in order to continue to efficiently fulfil its tasks"
, says Paulini. "With its high environmental standards, the new building also marks a further step towards a climate-neutral federal administration."
High ecological standards as an advantage
The three-storey building, part of which has a basement, has a district heating supply, a photovoltaic system, and a state-of-the-art energy management system. The solar power generated is to be used 100% internally.
In Berlin, the BfS operates facilities for monitoring environmental radioactivity and parts of the Federal Radiological Situation Centre. This is a special crisis unit. The office also manages its defence against nuclear hazards from its premises. It provides support in situations in which radioactive material has been handled without authorisation or misused. "Modern, crisis-proof equipment is the best way to fulfil our mission to protect people and the environment from radiation", says Paulini.
Time capsule for the foundation block
Source: BfS
Almost two years ago to the day, Paulini laid the foundation block for the building complex with the State Secretary in the Federal Ministry for the Environment, Nature Conservation, Nuclear Safety and Consumer Protection (BMUV), Stefan Tidow, and other guests. BBR President Petra Wesseler was there then as well as at the most recent event.
Handover is planned for mid-2025
The reinforced concrete skeleton building replaces the tall prefabricated building erected on the site in the early 1970s. This had previously been used by the Staatliches Amt für Atomsicherheit und Strahlenschutz [State Office for Nuclear Safety and Radiation Protection] (SAAS) of the GDR.
On the three new storeys, around 3,600 m2 of floor space has been created for various types of office workstations, laboratories, workshops, and a library. The owner is the Institute for Federal Real Estate (BImA). The BBR is responsible for the construction work. The construction costs are forecast at around EUR 53 million. The handover to the BfS as the user is planned for mid-2025.
State of 2024.09.23